Stewardship
Church Votes to Hire Building Designer - Learn about a step toward developing a design for the new building.
During the join meetings of the building committee and deacons, several floor plans have been considered for the new building. One concept calls for a two story building with a basketball court in the center of the building. The court will allow enough space for two AWANA squares. A stage and a foyer will be on opposite ends of the court and fan seating on one side. Classrooms will surround the court on both floors. A kitchen will be on the first floor. A nursery will be built in the area between the existing fellowship hall and the new building. In the picture included with this text you can see a rough rendering of how the new building might look. The entrance to the building will be located on the eastern side (the side away from Crowley Road).
Building Fund Contributions as of July 2006
Building Fund: $595,162.83
Current Goal Position